jamesp
Cave Dweller
Member since October 2012
Posts: 36,562
|
Post by jamesp on Jan 14, 2015 19:17:17 GMT -5
Big tumbler froze, so it got shut down. About 7 days of running time. Video of unload: That was easy. Been running inclined to reduce impact, it bruised a couple of test rock, likely from not having barrel full enough. Can be inclined more, but filling the barrel more seemed reduce the banging best. Load of rocks Grinding wheel chunks reduced quicker in this design Not sure about the grind rate yet. If it does not grind well a barrel will be welded in place.
|
|